Feature Update

Custom Terrain Data Integration: Keeping Pace with Mining Operations

December 15, 2024 5 min read OTmate Team
Mining terrain with RF equipment

Real-time terrain monitoring in mining operations

The Challenge

Mining operations are dynamic environments where terrain changes weekly, or often over a 24hr period with a good production team.

Traditional RF planning tools rely usually on the Shuttle Radar Topography Mission (SRTM) for digital elevation model (DEM) data that was captured over two decades ago (circa 2000).

At OTmate, we understand that accurate terrain data is the foundation of reliable RF planning. That's why we've developed a comprehensive terrain data integration system that keeps pace with the rapid changes in mining environments.

Our Solution: Dynamic Terrain Integration

We know you likely have the most up to date terrain data available for your site. We support multiple terrain data formats and resolutions, ensuring that your RF planning always reflects the current state of your operation:

Supported Data Formats

  • DXF files - Mining design surfaces integration from mining planning software.
  • GeoTIFF - Industry-standard georeferenced imagery
  • TIFF - High-resolution raster data
  • ASC - ASCII grid format for elevation data

Resolution Capabilities

"Our system can process terrain data with resolutions of 2 meters or better, providing the precision needed for accurate RF modeling in complex mining environments."

Standard Resolution

30m DEM data covering all of Australia, perfect for regional planning and initial site surveys.

High Resolution

≥2m custom data for detailed modeling of specific mining areas and infrastructure.

Version Control for Forward Planning

One of our unique features is support for multiple DEM versions. This enables forward planning across year+N scenarios:

🔮 Future-Ready Planning

Upload planned terrain modifications and compare RF coverage across different timeline scenarios. Plan your infrastructure investments with confidence, knowing how terrain changes will affect your communications network.

Real-World Applications

Our customers use this capability to:

  • Optimize tower & trailer placement before construction begins
  • Identify coverage gaps before mining raise the issue.
  • Plan equipment relocations in advance of terrain changes
  • Validate RF designs against future site conditions.
OT

OTmate Engineering Team

Specialists in RF planning and OT infrastructure monitoring

© 2025 OTmate. All rights reserved.

Related Articles

Analytics

RF Planning Best Practices

Learn how to optimize your RF network design for maximum coverage and reliability.

Monitoring

Asset Monitoring in Mining

Discover how IoT sensors and predictive maintenance can optimize your operations.